Project Description
Yarrington Distribution Center
Location: Kyle, Texas
Client: Level 10 Construction
Project Type: Institutional – Community Building
Scope: Warehouse Development – 5 Buildings
Project Overview
The Yarrington Distribution Center is a large-scale logistics and distribution project situated between Kyle and San Marcos, consisting of five warehouse shell buildings designed for future office and industrial build-outs. The development includes essential site infrastructure such as parking, ramps, drives, and utility corridors, intended to support high-volume distribution operations.
Each building, while similar in function, required meticulous structural detailing to accommodate specific design intents and site coordination needs.
Structures Online was entrusted with the complete steel detailing for all five buildings, ensuring fabrication-ready accuracy and seamless construction integration.
Scope of Work
A. Roof Ladder Systems
Each building featured a two-stage roof ladder system:
The first ladder runs from the finished floor to the mid-platform.
The second ladder continues from the platform to the roof.
This configuration required careful elevation mapping, bracket detailing, and clearance validation to meet OSHA standards and architectural coordination.
B. Ramp Rails
Ramps incorporated guardrails and safety rails, detailed to maintain site safety while accounting for slope variations and embedded anchorage conditions. Rail heights, terminations, and transitions were coordinated with both architectural and civil layouts.
C. Brace Frame Connections
Each building utilized steel brace frames for lateral load resistance. The detailing involved:
Field-welded and bolted connections
Consideration of seismic and wind loading
Integration of gusset plate geometry with moment frame constraints
High-precision modelling was essential to ensure alignment and erection efficiency.
D. Dock Stairs
Staircases were provided for accessing the warehouse with safety compliance. These were detailed to allow personnel to move between the loading dock platform and the ground safely and included landing platforms, stringer supports, and handrail systems tailored to varying field elevations.
Key Deliverables
3D modelling for all structures to ensure accurate clash coordination
Deliverables included fabrication drawings, erection plans, and CNC data
Coordination with architectural, civil, and MEP teams for interface elements
Consistency across five buildings while accommodating unique on-site conditions
Project Outcome
Our detailing work enabled the project to maintain schedule alignment, reduce field conflicts, and streamline steel fabrication processes. By adapting to both repetitive and custom conditions across the five structures, Structures Online contributed to a smooth and scalable construction